Posted on Jul 23, 2022
Senate, Navy Pushing for Bath Iron Works, Ingalls DDG(X) Destroyer Team Up - USNI News
651
7
1
5
5
0
Posted 2 y ago
Responses: 1
PO1 William "Chip" Nagel
..." we upgraded the Flight III … we took up all of the service life allowance on that platform. All of the space, weight and power has all been allocated. There is not enough room on that ship to put a new combat capability that takes more power or a larger footprint within the ship,” deputy DDG(X) program manager Katherine Connelly said at the time.
“The first ship will focus on a new hull form and a new integrated power system. We will use the proven combat system from the Flight III ship so we are designing the ship with the flexibility and the margins to accommodate the future of the Navy and the needs for where we’re going.”
..." we upgraded the Flight III … we took up all of the service life allowance on that platform. All of the space, weight and power has all been allocated. There is not enough room on that ship to put a new combat capability that takes more power or a larger footprint within the ship,” deputy DDG(X) program manager Katherine Connelly said at the time.
“The first ship will focus on a new hull form and a new integrated power system. We will use the proven combat system from the Flight III ship so we are designing the ship with the flexibility and the margins to accommodate the future of the Navy and the needs for where we’re going.”
(2)
(0)
Read This Next