Avatar feed
Responses: 2
PFC David Foster
2
2
0
Somebody gonna land a big job with a lot of headaches for a long time lol....
(2)
Comment
(0)
SFC Senior Civil Engineer/Annuitant
SFC (Join to see)
>1 y
Boy! You got that right.
(1)
Reply
(0)
Avatar small
LT Brad McInnis
1
1
0
I just saw a YT video on these projects in California. Most of them seemed to go back in to the university/foundation/study phase. No real reason given. As a former engineer, my guess is these projects were not ready for a commercial company to come in and take over. So, they left them in the public sector. It is a shame because some of them looked like promising projects.
(1)
Comment
(0)
SFC Senior Civil Engineer/Annuitant
SFC (Join to see)
>1 y
There may be some that are promising, the ones that I had a chance to review their technical proposals seemed complete even though I didn’t agree with the concept, they could have moved forward from a technical standpoint. The only thing I could think of that would stop them is money. There’s a lot of equipment to maintain with minor payroll costs. I guess there isn’t enough price difference between high and low energy rates to make a go of it. I never saw the cost analysis, only the overall concepts, how they affected the specific sites, and if they would work as described. I also reviewed cogen plants burning waste coal, and I reviewed the cost data for them enough to say that the higher energy costs go, the more feasible some of these renewable sources look.
(0)
Reply
(0)
Avatar small

Join nearly 2 million former and current members of the US military, just like you.

close