Avatar feed
Responses: 2
SGT Air Defense Radar Repairer
3
3
0
1. There was no Patriot failure in Saudi Arabia. It was operator error.
2. As to friendly fire if the Pilots do not turn on their transponder or return in specified lanes and altitude they will be targeted and engaged as they are considered enemy targets and they know this
3. It's propaganda about the targets at 100 plus miles. No one engages at that distance as your chance of a kill is very low. Not saying it cannot be done or ws done but the closer the target the greater the chance of a kill.
4. I see problems with this new radar just from the pic. Its not going to function to the level of a patriot system.
(3)
Comment
(0)
SGT Air Defense Radar Repairer
SGT (Join to see)
8 mo
COL Randall C. The 100 hour clock error was a known issue long before Desert Storm. Why the crews were not aware of the issue is not known to me. I took it as common knowledge that you would need a temporary momentary shutdown to reset the clock.
(1)
Reply
(0)
COL Randall C.
COL Randall C.
8 mo
SGT (Join to see) - The error was not a "known issue long before Desert Storm".

While I wasn't with the Battalion during DS/DS (I was in another ADA unit in the 11th), I became the S-2 after they returned from the Gulf and was involved with many of the investigations (particularly the GAO one) that occured after the fact to determine what went wrong.

The error caused by long periods of operation was only reported a couple of weeks prior to the incident from the Patriot units that were deployed in Israel. It took the PPO (Patriot Project Office) and Raytheon two weeks to track down and implement a fix for the software and start distributing it to the field, and the patch was delivered to the unit in Dhahran on February 26th, one day after the Scud impacted on the warehouse.

While the PPO did send a message out to the field a few days prior to the Scud incident warning about the issue ("long run times" could affect TBM targeting) and that there would be a software upgrade in the next few days, there was no action directive nor did it specify what "long run times" were.

As Alpha Battery (the one who's footprint covered the projected impact area of the Scud) was in continuous operation because the other battery they were collocated with had their radar down for repairs, the decision was made not to bring it down until the patch was on-site.

** EDIT ** - was able to track down the GAO report on the incident - https://www-users.cse.umn.edu/~arnold/disasters/GAO-IMTEC-92-96.pdf
(0)
Reply
(0)
SGT Air Defense Radar Repairer
SGT (Join to see)
8 mo
COL Randall C. - Then how was I aware of it before Desert Storm. As to Raytheon's knowledge I'm sure they also knew but they most likely considered it a low priority to address due to normal thinking that at no time would a system be required to run that long without being shutdown. It was a simple ting to fix. All one had to do was shutdown the radar for a period of time that would allow the capacitors to disperse their charge then power back up.

There were 2 other issues that arose that Raytheon's Knowledge Base could not address. One was totally situational ,basically a 1 in a billion chance of happening. The other one was a 1 in a million chance and most likely overlooked as a possibility for causing the problem I was facing. Now we know that mechanical systems vibrate harmonically at certain discrete frequencies which are known as natural frequencies of a system and the question I was facing was according to the diagnostic tapes was either a loose connection or card. Yet the fault was being reported at a faster rate than the natural frequencies of the system. Using Raytheons diagnostic tapes to confirm my suspicions along with Doc's agreement with my assessment that it was a component that was breaking down such as an oscillator. and not a vibrating connection I went and back traced the signal unit I discovered the oscillator, replaced the card and confirmed that the problem had been fixed.

My guess is that when the diagnostic software was developed this possibility just was not considered which is why only a loose connection was indicated as the problem and I'm sure its been corrected as they spent 3 days confirming my solution to the problem.
(1)
Reply
(0)
COL Randall C.
COL Randall C.
8 mo
916bea3c
SGT (Join to see) - How you were aware of it prior to the rest of the Army? I have no idea. Which unit were you with? 3-43? 32d AADCOM? I guess it's possible that it was known to you and your unit and never properly reported up to the PPO so that the rest of the Army would be aware of the issue. As to the other issues you raise, I can't comment as I'm not knowledgeable about them.

The first it was reported to the PPO was when the Patriot units in Israel reported an issue to them on February 11th, two weeks prior to the Scud landing on the warehouse. That's not in dispute by any official record.

However, I suppose the GAO, Raytheon, the Patriot Project Office, the Pentagon, and the 11th ADA Brigade leadership could have been covering up that a 20+ hour error was known prior to it being officially reported to the PPO, but that's probably a stretch.
(0)
Reply
(0)
Avatar small
PO1 William "Chip" Nagel
1
1
0
LTC Eugene Chu The Leaps and Bounds Made by Surface to Air Missiles since My Time in Desert Storm and Desert Strike are Bloody Amazing!
(1)
Comment
(0)
Avatar small

Join nearly 2 million former and current members of the US military, just like you.

close