Posted on Jul 14, 2017
The U.S. Navy is looking to dump the LCS for a better, more capable frigate | SOFREP
528
8
4
3
3
0
Posted >1 y ago
Responses: 3
1stSgt Eugene Harless
It takes a few years to actually go from a concept to a actual vessel in the water. As construction is underway on a new class of vessel, there is always a ton of " re-work" to be done simply to make the pieces " fit". Often once tested its discovered the performance is not up to what was expected. Through in different advances in technology and changes in mission and there can be a huge change in designs.
(1)
(0)
Read This Next