MSgt (Join to see) Lots of cost over runs these days in military projects it seems.
(1)
Comment
(0)
Avatar small
PO2 Rev. Frederick C. Mullis, AFI, CFM
0
0
0
HyperLink is bad
(0)
Comment
(0)
MSgt Electrical Power Production
MSgt (Join to see)
>1 y
Yup it is now, but it was good back in 2016.
(0)
Reply
(0)
PO2 Rev. Frederick C. Mullis, AFI, CFM
PO2 Rev. Frederick C. Mullis, AFI, CFM
>1 y
Situation is the same, The Kennedy and the Enterprise need to be built with Steam cats and arresting gear and conventional Weapons Elevators until they get this new crap worked out. It is still not right. No use in putting unfounded technology on two more carriers and have them cripple before they are even launched. The FORD is as clumsy as her namesake. It is NOT FAIR to her crew! They deserve a Ship that works!
(0)
Reply
(0)
Avatar small
MCPO Roger Collins
0
0
0
When it takes 15+ years to build a warship, technology changes, that means change orders $$$$$. Not only that, but these changes effect test plans that takes time. And it remains to be seen if it’s mission ready now.